Home / Knowledge Pool / Publications
Scientific Outputs
30 August 2026
This report systematically assesses the distribution, formation conditions, and risk levels of debris flows along the China-Nepal Transportation Corridor.
Scientific Outputs
29 August 2026
A joint team from CBAS and IRDR China, analyzed domestic and international satellite imagery to assess the mudslide-affected area. 97.2 km of river channel affected and river water area increased to 4.85 times the pre-disaster level.
Scientific Outputs
28 August 2026
This IRDR Data Brief summarizes the satellite and scientific data resources made available by IRDR's partner in China for the cascading and transboundary disaster events.
Disclaimer of use | Privacy Policy | Terms of use | Contact us|
Copyright 2023 Integrated Research on Disaster Risk. All rights reserved.
+86 10 8217 8917
Room B713, No.9 Dengzhuangnan Rd., Beijing China 100094